Refurbishment of Staff Area

Profile
Architects: 51 pct Architects
Engineers: n/a
Contract: Duration 3 weeks
Contract Sum: £12,072.34
Summary
Initially we had been asked to come in to carry out maintainence
work. while the main Gallery was being refurbished by Wallis.
As the opening date closed in we were asked to come in to
tender for refurbishing the staff area of the gallery. This was
treated outside of the mian contract that the gallery had with
Wallis.
We worked along side 51% Architects as we rifled through the
refurbishment in 3 weeks that had been allocated. The schedule
of work included a few delicate joinary items one of which was
the ‘locker unit’.
Architects: 51 pct Architects
Engineers: n/a
Contract: Duration 3 weeks
Contract Sum: £12,072.34
Summary
Initially we had been asked to come in to carry out maintainence
work. while the main Gallery was being refurbished by Wallis.
As the opening date closed in we were asked to come in to
tender for refurbishing the staff area of the gallery. This was
treated outside of the mian contract that the gallery had with
Wallis.
We worked along side 51% Architects as we rifled through the
refurbishment in 3 weeks that had been allocated. The schedule
of work included a few delicate joinary items one of which was
the ‘locker unit’.